News

The Second Niger Bridge Has Been Completed – Fashola

The Minister of Works and Housing, Babatunde Fashola, has announced the completion of the Second Niger Bridge.

He disclosed this in Abuja on Wednesday, October 19, at the release of President Muhammadu Buhari’s scorecard series (2015-2023).

However, Fashola noted that the bridge’s access roads are still under construction.

He said, “I can confirm that the second Niger bridge itself is finished. People can walk through the bridge now unimpeded. What remains is the four-kilometre interchange road at the Asaba end and 2km out of a 7km link road at the Onitsha end.

“Right now, our dredger is in place, we have to rebuild the road by reclaiming sand, the recent surge of flood has slowed us down. On the Onitsha side, there is a 7kilometer road that links the bridge and the Onitsha-Owerri interchange.

“The first thing we did when we came into power was we expanded our budget on road infrastructure, sought alternative sources of funding through SUKUK, Infrastructure Tax Credit Scheme,” Fashola said.

Leave a Reply

Your email address will not be published. Required fields are marked *

You May Also Like

News

A video purportedly shows the late founder of the Fountain of Life Church, Pastor Taiwo Odukoya, designating his preferred successor prior to his death,...

Sport

Among the prominent figures nominated for the 2026 BEYOND Developments Globe Soccer Awards are Lionel Messi, Cristiano Ronaldo, Kylian Mbappe, Ousmane Dembele, and Lamine...

Sport

Wayne Rooney has revealed that he contemplated suicide even as he flourished on the pitch for Manchester United when the Premier League club was...

Politics

At the All Progressives Congress (APC) presidential campaign rally in Anambra State on Thursday, there was a little drama when Chris Ngige, a former...

Copyright © 2025 Agnes Isika Blog. All rights reserved.